Situation

A petroleum refinery operates a wastewater treatment plant under a National Pollutant Discharge Elimination System (NPDES) permit, but their current permit was expiring. The client retained ATC to provide consulting services with generating the permit renewal application package and obtaining the permit.

Z

Results

ATC’s environmental specialists guided the process and developed the application package that met the regulatory agency’s standards. We analyzed historical data of wastewater at the site, prepared a sampling plan, and analyzed data to assess potential issues regarding water quality criteria. ATC provided a thorough technical review of the draft Permit issued by the agency and provided comments on behalf of our client. Due our in-depth knowledge of the permit process, our team was able to negotiate and obtain favorable permit conditions for our client.