Projects: Excavate The Plan Due Diligence Situation A client was preparing to acquire and redevelop a new property. On the 1.38‐acre site, the majority of existing structures and surface parking needed to be demolished and excavated for new construction. ATC was...

Crude Oil Production Facilities

Projects: Crude Oil Production Facilities Due Diligence Situation A petroleum client was preparing to close facilities over a 300+ square-mile area that operated from the early 1960’s to 2005: production wells, storage tanks, pumping stations and pipelines. The...